Compare tekmar Multi-Staging Controls

Improve efficiency with staging control.

tekmar Multi-Staging controls coordinate heat source operation to better match the load, lowering energy costs and facilitating redundancy.

tekmar 40 Years

System Requirements

284

289

294

294 w/ up to 3 294EXP

On/Off Boilers

Maximum Number of each type

1 Stage

4*

2 4 16

2 Stage

4*

- 2 8

3 Stage

1

- 1 5

4 Stage

1

- 1 4

Modulating Boilers

Maximum Number of each type

Burner Firing Rate

4*

- 4 16

Target Temperature

4*

- 4 16

Mixed Boiler Plant Control

Combine condensing & non-condensing boiler groups

●

-

●

●

DHW Through Valves (V) or Pumps (P)

Indirect domestic hot water (IDHW) operation

P

P P P

Stand-by Pump Operation

Automatic back-up pump start to improve system reliability

●

-

●

●

Setpoint Operation

Hot water for hot-tubs, pools & snowmelt

●

-

●

●

Dedicated DHW Operation

Hot water for dedicated domestic hot water (DDHW) tank

●

●

●

●

BACnet® & Modbus® Communication

Remote monitoring & adjustment capability with BAS

●

- - -

Modbus® Communication to boiler

●

-

●

●

Accept EMS 0-10 V (dc)

Connect to tekmarNet® / EMS systems

●

●

●

●

Nexa™ by Watts mobile app

Remote monitoring and notifications using the Nexa™ by Watts desktop and mobile apps

-

●

●

●

Features & Benefits

284

289

294

294 w/ up to 3 294EXP

Outdoor Temperature Reset

Adjust water temperature based on outdoor temperature for energy savings

●

●

●

●

Warm Weather Shut Down

Shut down heating systems in warmer weather

●

●

●

●

Automatic Differential

Manage boiler run times automatically to reduce cycling

●

●

●

●

Indirect DHW Priority

Suspends space heating to focus on indirect domestic hot water (IDHW)

●

●

●

●

Equal Run Time Rotation

Boilers run equal amounts of time & receive equal wear

●

●

●

●

Pump Exercising

Briefly run pumps to prevent seizing

●

-

●

●

Pump Post Purge

Run pumps to flush residual heat energy from the boiler

●

-

●

●

Primary Pump Rotation

Pumps run equal amounts of time & receive equal wear

●

- - -

Fixed Lead Option

Run high efficiency boilers first to maximize energy savings

●

-

●

●

Fixed Last Option

Run inefficient boilers last to improve overall plant efficiency

●

-

●

●

tekmarNet® Communication - 2 or 4 Wire

Network communication provides greater functionality

4

- 4 4

tekmarNet® Communication - Number of Boiler Buses

Up to 24 tekmarNet® devices can be connected per bus

4

- 1 1

Remote tekmarNet® Monitoring

Access tekmarNet® systems via the internet with a Gateway 486

●

- ● -

Built-in Setback

Simple, programmable schedule for greater energy savings

●

●

●

●

DHW Recirculation Pump

Conserve energy by running pump on a schedule Recirc.

Recirc

or

C.A.

●

●

●

Combustion Air Damper Output

Close damper when system is off & open before operation

●

●

●

Alert Output

Provide notification of error & warning events

●

●

●

●

Energy, Flow & Pressure Monitoring

Provide advanced system monitoring

●

●****

●****

●****

Boiler Outlet & Vent Temperature Monitoring & Limiting

Provide advanced monitoring & limiting to improve overall plant reliability

●

- - -

Flow Proof

Proof of flow to enable backup primary pump or trigger failure notification

●

- - -

Combustion Air Proof

Proof of combustion air before allowing boiler plant operation

●

- - -

**** Pressure Monitoring only.